Bay Improvements

The Bay Improvements Projects are overseen by a sub committee that meets at quarterly intervals.

Dates

Project

Status

end 2006

Fill in the shelter windows on the road side to give greater weather protection.

Completed

September to November 2007

Use grant from the Footprint Trust to landscape and plant a drought tolerant garden by the well.

Planted. See pictures of the garden

Autumn 2007

Summer 2009

Strip, sand smooth and paint the inside of the Shelter

Design a three panel mosaic, train and guide local volunteers in creating the mosaic

Completed. See pictures of the mosaic

Autumn 2007

Make up and erect an Information Board on the road side of the Shelter

Completed. see pictures

Summer 2007

Erect a flag pole at the Bay. This is to be in line with the centre of the slipway but far enough back as so as not to interfere with the boats and winch.

Erected.

Summer 2009

In association with other local groups and to celebrate the bicentenary of Tennyson's birth in 1809, a toposcope was installed near the Tennyson monument.

Erected. see pictures